Waterfront Bulkhead Construction in Staten Island, NY
Another job finished, and a big transformation along the Staten Island waterfront. This project involved rebuilding and forming the concrete bulkhead, pouring the new waterfront section, backfilling, grading, and leaving the entire work area clean and ready for use.
Working Along the Water
Bulkhead and waterfront work comes with its own set of challenges: tides, uneven ground, and limited room to maneuver equipment near the water’s edge. Working this close to the water presented a few challenges, but careful planning and the right equipment got it done.




From a rough construction area to a solid, clean finished product, there’s nothing better than stepping back at the end of a job and seeing the results.

Bulkhead Construction Staten Island Property Owners Can Rely On
Whether it’s forming and pouring a new bulkhead, backfilling, or grading a waterfront site, we bring the equipment and experience needed to work safely and effectively along the water. If you need bulkhead construction in Staten Island handled start to finish, give Latitude Land Contracting a call at (609) 731-2858.
Latitude Land Contracting, LLC
Built on direction, driven by results.

